Repair and Refurbishing Thermoplastic for UK Container Maintenance

29-08-2018

Internal and External Markings
Completed Internal Roadway
UK Container Maintenance, contracted Riggotts to carry out over 1200m of lining. — Programming

First-time clients, UK Container Maintenance, contracted Riggotts to carry out over 1200m of lining. The project included: 21 pedestrian logos, lettering, roadways, and pedestrian crossings. The Internal works were completed in Single Pack Epoxy and sealed following rigorous preparation to the surface area to ensure a durable finish. Externally, to enable longevity and durability, the finished works were carried out in Thermoplastic thus securing good adhesion to the surface.

 

Thermoplastic External Completed

Completed Internals